Soleman, A., A. Tutuhatunewa, and R. Pakay. “ANALISIS KUALITAS LIMBAH WASTE WATER TREATMENT PLANT PADA PLTMG. SERAM PEAKER 20 MW DENGAN MENGGUNAKAN METODE SEVEN TOOLS”. ALE Proceeding, Vol. 5, Oct. 2022, pp. 97-05, doi:10.30598/ale.5.2022.97-105.