[1]
Madiun, W.S. and Kakerissa, A.L. 2017. ANALISIS BEBAN KERJA KARYAWAN BAGIAN PRODUKSI DENGAN MENGGUNAKAN METODE FULL TIME EQUIVALENT (FTE) DI UD ROTI ALVINE. ARIKA. 11, 2 (Sep. 2017), 89-96. DOI:https://doi.org/10.30598/arika.2017.11.2.89.