Ilwaru, V., Rahakbauw, D., & Tetimelay, J. (2018). PENJADWALAN WAKTU PROYEK PEMBANGUNAN RUMAH DENGAN MENGGUNAKAN CPM (CRITICAL PATH METHOD). BAREKENG: Jurnal Ilmu Matematika Dan Terapan, 12(2), 061-068. https://doi.org/10.30598/vol12iss2pp061-068ar617