Ilwaru, Venn, Dorteus Rahakbauw, and Jeky Tetimelay. 2018. “PENJADWALAN WAKTU PROYEK PEMBANGUNAN RUMAH DENGAN MENGGUNAKAN CPM (CRITICAL PATH METHOD)”. BAREKENG: Jurnal Ilmu Matematika Dan Terapan 12 (2), 061-068. https://doi.org/10.30598/vol12iss2pp061-068ar617.