Ilwaru, V., Rahakbauw, D. and Tetimelay, J. (2018) “PENJADWALAN WAKTU PROYEK PEMBANGUNAN RUMAH DENGAN MENGGUNAKAN CPM (CRITICAL PATH METHOD)”, BAREKENG: Jurnal Ilmu Matematika dan Terapan, 12(2), pp. 061-068. doi: 10.30598/vol12iss2pp061-068ar617.